Wolumla, Frogs Hollow, Greendale Creeks Flood Study

Have your say on the flood study that assesses flooding from catchment effects and rainfall at Wolumla, South Wolumla, Frog's Hollow and Toothdale, and localities along the Wolumla Creek, Frog's Hollow Creek and Greendale Creek.


Bega Valley Shire Council is undertaking a Flood Study and a subsequent Floodplain Risk Management Plan for the catchment areas of the Wolumla Creek, Frog’s Hollow Creek and Greendale Creek and their surrounding areas. The study defines the current and future flood behaviour in this area.  It will assist in identifying flooding trouble spots, including areas where flood mitigation measures may be of benefit, and will assist in ensuring future development is not exposed to an unacceptable flood risk.  Council has engaged consultants, Rhelm, to assist with the completion of the project.

The Flood Study and future Floodplain Risk Management Plan, are being prepared to meet the objectives of the NSW State Government’s Flood Prone Land Policy.  The study establishes the basis for subsequent floodplain management activities.

Under the State Policy, NSW Local Governments are responsible for identifying and managing the risk to life and property from flooding. One of the most important steps in this process is increasing our community’s awareness of flooding so people are better able to understand and plan for flood risks they face.

For most people, there will be no immediate change to their situation as a result of this study. However, property owners who are planning redevelopment of their property may need to take some additional steps as part of the consent process because flood-related development controls may apply. For example, the construction of new buildings may need to be set at or above suitable Flood Planning Levels to minimise flood risk.

The flood risk has been assessed using computer-based flood models that assist in defining the likely depth and speed of water movement along each creek. The assessments include the following locations:

  • Wolumla
  • South Wolumla
  • Frog’s Hollow
  • Toothdale
  • localities along the Wolumla Creek, Frog’s Hollow Creek and Greendale Creek

The study has also assessed the flood risk of local rainfall within the Wolumla village area and resulting overland flooding issues.

Have Your Say

The Flood Study is currently a draft document and we would like your feedback. The draft documents can be downloaded from the Documents on Exhibition area.

This online platform has lots of information about the project and provides an opportunity to ‘Have Your Say'.

The project team will be available to discuss the draft findings with you at the following community information drop-in session:

  • Wolumla Public School Library, Bega Street, Wolumla
    Tuesday 6 May between 3.30pm to 5.30pm

You can provide feedback

 

 

 

Who's listening

Gemma Gill
Civil Assets Superintendent
Bega Valley Shire Council

Derek Van Bracht
Environmental Mangement Coordinator
Bega Valley Shire Council

Phone: (02) 6499 2222
Email: council@begavalley.nsw.gov.au

 

Timeline


  • 10 Oct 2023

    The study commenced with a project initiation between Council and DCCEEW (then DPIE) staff with the consultants; Rhelm.

  • 17 May to 2 June 2024

    • First round community consultation
      • A community survey was made available online 17 May 2024 – 2 June 2024 and then extended for a further two weeks on Council’s website.
      • Door knocking occurred on 29 May 2024 within the village
      • A drop-in information session was held at the Wolumla Public School also on 29 May 2024

  • 18 April 2025

    • Public exhibition period commences
      • The draft Flood Study on exhibition from 18 April to 18 May 2025, with a drop-in session to be held at Wolumla Public School.

  • Mid to late 2026

    Flood Study and Floodplain Risk Management Study and Plan endorsed by Council.


 

Please submit your feedback by: Sunday 18 May 2025

 

Frequently asked questions


A 1 in 100 year flood is a flood event that has the probability of occurring on average once every 100 years, i.e. there is a 1% chance of a flood of this size occurring at a particular location in any given year. This does not mean that if a location floods one year that it will not flood for the next 99 years. Nor, if it has not flooded for 99 years that it will necessarily flood the next year. Some parts of Australia have experienced more than one ‘1 in 100 year’ floods within a decade of each other. Within the draft Flood Study the ‘1 in 100 year’ flood is referred to as the 1% AEP (Annual Exceedance Probability) flood event.

The Flood Planning Level (FPL) is a height used to set floor levels for property development in flood prone areas. It is generally defined as the 1% AEP flood level plus an appropriate freeboard (see explanation of ‘freeboard’ below). This level may be higher for vulnerable land uses (e.g. hospitals or schools).

The flood planning area is the area within which developments may be conditioned with flood related development controls. The flood planning area is calculated as the area below the Flood Planning Level.

A freeboard is a height above the 1% AEP flood level that is included in the Flood Planning Level to account for factors such as wind, waves, unforeseen blockages and other localised hydraulic effects. Freeboard is set for a given catchment area based on the local flood behaviour and risk.

The Flood Study provides a preliminary assessment of the impacts of sea level rise and changes in rainfall. The impacts of climate change are not included in the design flood maps (e.g. 1% AEP flood depths).

Council’s flood modelling determines the extent of flooding throughout the catchment and the identification of properties partially or fully impacted by flooding.

Council already has a number of published flood studies and floodplain risk management plans for select areas on its website available here.

In some instances, residents may need to engage a registered surveyor or flood engineer to determine the flood level on their property where no detailed studies exist.

If the situation is life threatening you should call 000.

For other assistance during an emergency such as flood, storm or tsunami, please contact the NSW State Emergency Service (SES) on 132 500 or visit their website at www.ses.nsw.gov.au.

It is best to be prepared for any flood. The State Emergency Service provides advice on how to manage your flood risk at floodsafe.com.au.

NSW Councils have responsibility for identifying and managing flooding, and informing the community. Councils follow the NSW Flood Prone Land Policy, which outlines how Councils should manage flooding, to reduce the risk to people and properties as described within the NSW Floodplain Risk Management Manual (2023).

Councils prepare Flood Studies and Plans according to the NSW Government's Flood Risk Management Manual (2023) and implement associated recommendations with technical and financial assistance from the NSW Government and key stakeholders through the Flood Prone Land Policy.

If the situation is life threatening you should call 000.

For other assistance during an emergency such as flood, storm or tsunami, please contact the NSW State Emergency Service (SES) on 132 500 or visit their website at www.ses.nsw.gov.au.

It is best to be prepared for any flood. The State Emergency Service provides advice on how to manage your flood risk at floodsafe.com.au.

There are three main ways of managing flood risk:

  • emergency management
  • property modification
  • flood modification

Emergency management measures seek to help people at risk during a flood. This includes sharing information with the State Emergency Service, flood warning systems and identifying evacuation routes and locations of emergency refuge centres.  

Property modification measures consider the way in which land is used, the buildings that are on it and the extent of flooding on a property. These measures are typically addressed in Local Environmental Plans and Development Control Plans.

Flood modification measures change the behaviour of flood waters with structural methods. This may include levees, creek management, estuary entrance management and improved stormwater infrastructure. 

The information from the adopted study outcomes will be used to inform future floodplain risk management activities to manage the identified flood risk. Some of the study outputs and/or future activities will better inform land-use planning outcomes, emergency response and strategic asset planning. Where a house may be in an identified flood zone, certain land-use planning or development controls may apply. The relevant land-use planning or development controls are typically noted on a section 10.7(2) certificate that list the relevant controls for a parcel of land. The study outcomes will be used to inform and review existing section 10.7(2) certificates, emergency response and strategic asset plans for the relevant catchment area.

There is a chance that floods of any size will occur in the future. As the size of a flood increases, the chances of it occurring becomes smaller. Because some rare types of floods have not occurred for over a century, the height of future floods is predicted using computer-based models. These models simulate different flood levels, speeds and direction for different sized floods.

Given the importance of accurately predicting flood levels and information, Council engages experts to establish and operate these computer-based models.

From time to time, these models are reviewed, and predicted flood levels may change slightly. The reason why the models are revised can include:

  • New floods occurring, providing additional data to fine-tune the model
  • Flood mitigation works undertaken may change flood levels
  • More advanced computer-based models becoming available
  • Development within the floodplain (which may be outside our control)
  • Changes in technical guidelines and requirements
  • Changes in State or Local policies.

For the Wolumla region, no models have been developed. The development of computer-based models to predict flood behaviour is a key outcome of this study.

A Flood Study provides technical information on the likelihood and characteristics of flooding within a catchment. It provides detailed information about the nature of flood risk including the distribution, extent, depths, levels, and speed and direction of floodwaters for a range of storm events, including a 1 in 100-year flood. 

A floodplain risk management study and plan examines flood behaviour and identifies and prioritises options to help protect people and property through better planning, emergency management and infrastructure works.


 